Accelerating Toward Gold Production Through High-Grade Discovery and Development Momentum Scottie Resources Corp. (TSXV: SCOT)
February 27, 2026
scot

Our client Scottie Resources Corp. continues its rise as one of the most compelling success stories in the Golden Triangle, driven by disciplined exploration, consistent high-grade results, and a rapidly maturing development strategy. This updated article includes a new section detailing how the company is accelerating toward production, as requested.


Overview: Who Is Scottie Resources and Why It Matters

Scottie Resources Corp. is a Canadian mineral exploration company focused on advancing high-grade gold projects in British Columbia’s prolific Golden Triangle — one of the world’s most attractive gold districts. The company’s flagship asset is the Scottie Gold Mine Project, a 100%-owned land package that includes the historically significant past-producing Scottie Gold Mine and the emerging Blueberry Contact Zone.

Historically, the Scottie Gold Mine produced near-mine high-grade gold, and for the past several years Scottie has built on that legacy with systematic drilling and resource growth, transforming the project into a major exploration success story in Canada’s mining sector.


Strategic Breakthrough: The Blueberry Contact Zone

At the centre of Scottie’s recent ascent is the Blueberry Contact Zone, an area first lightly tested a few years ago but now clearly emerging as a core value driver for the company. This zone sits approximately 2 km northeast of the old Scottie Gold Mine and is directly tied to the company’s expanding resource base and development strategy.

Why Blueberry Is Transformative

  • Consistent High-Grade Intercepts: Drilling has repeatedly returned high-grade gold over significant widths, indicating continuity and robustness in the mineral system — an essential criterion for economic gold deposits.
  • Scale and Infrastructure Advantage: The zone extends over more than 1,550 m of strike and deeper than 525 m, with road access that enhances logistics and development flexibility.
  • PEA Backing: A Preliminary Economic Assessment (PEA) released in late 2025 underscores Blueberry’s role in a staged development approach, starting with near-surface mining and progressing into underground production.

 Recent News Flow: Sustained Drilling Success

Scottie’s news cadence throughout 2026 has been vigorous, centered on uninterrupted reporting of high-quality drill results. 2026 drilled hole releases include progressively impressive gold intersections, demonstrating not only the presence of high grades but also continuity, scale, and development relevance.

Key Highlights from 2026 Releases

DateHighlight Intercept
Feb 3, 202615.8 g/t gold over 12 m and 10.4 g/t over 8.95 m
Feb 10, 202630.42 g/t gold over 5.6 m and 9.67 g/t over 8.85 m
Feb 17, 2026141 g/t gold over 4.55 m and 54.6 g/t over 7.05 m
Feb 25, 202614.4 g/t gold over 40.75 m and 42.5 g/t gold over 4.40 m (today’s release)

Today’s Breakthrough: Broad and High-Grade Mineralization

The day’s news release underlines a shift from isolated high-grade veins to broad, continuous gold mineralization:

  • 14.4 g/t gold over 40.75 m — a wide intercept with robust grade, significant for near-surface development.
  • 42.5 g/t gold over 4.4 m — exceptionally high grade within the same system.
  • Nearly half of all holes drilled in 2025 hit >5 g/t gold, with 30% yielding >10 g/t.

Combined, these results reinforce a critical conclusion: Blueberry is moving beyond discovery into the realm of production-scale mineral continuity.


How Scottie Resources Is Accelerating Toward Production

Adding new essential context requested: Here is how Scottie has shifted from an explorer to a company actively executing a production-focused development plan.

1. A Strong PEA That Supports a Clear Mine Plan

The 2025 PEA demonstrated that the project has strong economics even at conservative gold prices. This provides the financial and technical backbone required to move toward feasibility work and construction planning.

2. Scaling Up Drilling to Fast-Track the Resource

The company completed 27,300+ metres of drilling in 2025 and continues with aggressive 2026 campaigns. This scale of drilling is characteristic of companies preparing resource upgrades for feasibility studies and mine permitting.

3. High-Grade Continuity = Development-Ready Geometry

Today’s results — broad, high-grade intercepts — indicate:

  • predictable geometry,
  • continuous zones rather than isolated hits,
  • and near-surface mineralization suitable for early-stage mining.

These features greatly accelerate engineering design and operational planning.

4. Infrastructure Advantage

Scottie benefits from exceptional logistics for a Golden Triangle project:

  • existing roads,
  • practical access to power and regional infrastructure,
  • a past-producing mine footprint.

This materially shortens timelines and reduces capital expenditures when moving toward production.

5. Bulk Sample Revenue & Metallurgical Work Underway

The company has already begun bulk sample permitting and early revenue development. Metallurgical optimization — essential for plant design — is also progressing, laying the groundwork for construction decision-making.

6. A Clear Workstream Toward Feasibility (2026–2027)

Scottie’s stated path involves:

  • continued drilling in 2026,
  • resource expansion and upgrading,
  • detailed engineering and environmental studies,
  • followed by a full feasibility study expected in 2027.

This timeline places the company firmly on a rapid track toward an eventual construction decision.


Broader Context: What This Means for Scottie

Scottie isn’t just drilling — it is systematically de-risking its project:

  • strong high-grade results,
  • rapidly expanding resource models,
  • funded exploration programs,
  • and infrastructure advantages.

Taken together, these elements reduce project uncertainty and accelerate the shift from gold discovery to gold production.


 Final Verdict

Scottie Resources’ recent success is not accidental. It reflects strategic drilling, strong economics, and a clear intent to fast-track its flagship asset toward production. Today’s broad, high-grade results reinforce that the Blueberry Contact Zone is evolving into a production-scale deposit with real economic promise.

Scottie is no longer just a discovery story — it is a development-stage company accelerating toward becoming a new high-grade gold producer in Canada’s Golden Triangle.